Stagebuild: Loading a plan of a higher stage on top of an already constructed plan of the same build will not remove the modules of the earlier stage.
Features:
- total Container Storage: 600K
- 3 S/M Bays
total Cost: up to 3.6 M
Features:
- Container Storage: 4200K
- 6 L/XL bays
- 6 S/M Bays
Cost: up to 15.2 M
Features:
- Container Storage: 14700K
- 12 L/XL bays
- 6 S/M Bays
Cost: up to 27.8 M
My other builds: viewtopic.php?f=195&t=454904

